Rescuing a Failed Commercial Renovation
When a Licensed Contractor Wasn't Enough: Bringing a Laundromat Back From the Brink
The Situation
A commercial laundromat tenant improvement in the San Fernando Valley area of Los Angeles County was already underway when the original contractor, working without a valid license, left the project in a state that put the client at risk of financial ruin. Code violations, incomplete utility work, and unsafe electrical conditions meant the space couldn't legally or safely operate.
Taking Over
Marjin stepped in to complete the project from the ground up, managing every trade personally:
- Electrical: Corrected multiple code violations left by the previous contractor, and discovered a subpanel that had been illegally tapped from the main panel: power was being diverted from the client's system. Identified the issue, resolved it with the landlord, and restored full, safe power to run all equipment without risk of tripping.
- Gas: Coordinated the conversion from low-pressure to medium-pressure gas service, then guided installation of the property gas line and a pressure regulator manifold across three separate stations, work governed by strict City of Los Angeles code compliance and regulatory requirements.
- Plumbing: Installed 24 commercial washers and dryers with full venting, waste, and water-supply connections, tying into existing underground lines. Installed 7 floor drain troughs with proper connections.
- Mechanical: Managed full compliance for dryer venting systems.
- Hot water systems: Designed and installed 5 Navien tankless water heaters with dedicated return lines and 2" copper supply piping for hot and cold water throughout the property.
- Compliance: Brought the facility into full Title 24 compliance, upgraded the existing bathroom to full ADA compliance (it did not meet current code), and coordinated industrial waste management requirements directly with the utility provider.
- Finishes: Managed flooring and painting so the client could open for business.
Solving a Design Problem in the Field
The permitted plans were 2D AutoCAD drawings that left too much room for error once subcontractors were on site. Using Revit, Marjin built 3D models from the 2D plans so every sub could see exactly how systems needed to come together, preventing costly on-site mistakes before they happened.
Running the Job
Beyond the trades work, Marjin personally hand-selected and managed every subcontractor, sourced all materials from the smallest fittings to major equipment to control costs, and kept the project moving on a tight budget.
The Result
A fully code-compliant, fully operational commercial laundromat, brought back from a near-total loss to a completed, permitted, functioning business.